Bridge cranes have significant advantages and potential in reducing factory equipment shutdown time for maintenance. By strengthening the maintenance and upkeep of equipment, improving the skill level of operators, and promoting the application of intelligent and automated technologies, we can further reduce downtime for maintenance and improve the production efficiency and economic benefits of the factory. Therefore, we should pay full attention to the role of bridge cranes in industrial production, actively take measures to leverage their advantages, and contribute to the sustainable development of factories.
Dongqi Crane will share a case of customized overhead crane today. The case is located in a steel distribution center in the UK. The initial goals for the warehouse were to improve material handling and reduce turnaround times at the centre, but as communication with the crane company deepened, it was eventually realized that maintenance downtime was critical to maximizing productivity.
Minimize downtime
The centres are position as locally accessible steel stock facilities that offer late and sections for use in engineering and marine fabrications or structural steelwork that can be cut, shot blasted and then painted prior to delivery to customers that will use the material in the next stage of manufacture.
The final product combines logic and innovation to ensure efficient operation of the distribution center.
High-rate material flows and special processing needs require more innovative crane configurations. For this purpose the crane company supplied four cranes of a twin-bridge design, with two connecting beams spanning 20m brackets, and a 27m crane bridge was installed on these beams to carry the two six-tonne cranes. This allows for zoned north/south and east/west material flows, enabling steel to be brought into the processing area and transferred through the shot blasting and painting process before the finished steel is shipped to the customer.
Central to the configuration are two six-tonne hoists on each crane, which can be operated individually or in tandem to cope with so-called heavier or irregularly shaped loads, providing extra stability.
The hoist utilizes magnetic lifting technology, while an anti-collision system allows the crane to move safely on a shared gantry. These units feature an audible alarm and a flashing amber light to warn of the approach of other cranes. There are dual floodlights on each crane, which can be operated via remote control.
According to the business, citing maintenance downtime is imperative for maximum productivity so hours of service metering on all crane motions will assist in planning proactive maintenance to sustain the plants uptime and efficiency. In addition, crane control will be carried out by push button infra-red link to comply with Tata requirements. Elsewhere, other key safety features include taut-wire safety lines to crane bridge platforms and ten safety harness anchor points at key locations such as panels, crabs and end carriages.
What we learned from this case
Compressing the downtime of factory equipment for maintenance through overhead cranes can have a variety of positive impacts. First, reduced downtime means the production line can run more continuously, thereby increasing production efficiency and reducing production costs. Secondly, the application of bridge cranes can reduce reliance on manual maintenance, reduce maintenance errors and delays caused by human factors, and improve maintenance quality. In addition, the precise handling of bridge cranes can also reduce damage and wear of equipment during maintenance and extend the service life of equipment.
However, there are still some challenges that need to be overcome in order to achieve the reduction of maintenance time of factory equipment with overhead cranes. First of all, it is necessary to ensure that the operating and maintenance personnel of the bridge crane have professional skills and knowledge and can operate the equipment skillfully and accurately to avoid unnecessary delays during the maintenance process. Secondly, the design and implementation of the maintenance management system need to be improved to ensure that its cooperation with bridge cranes can achieve the best results.
How overhead cranes help reduce downtime for factory equipment repairs
jiexiuwan 发布于 2024-03-12T08:35:19Z